Patimban Back Up Area is planned to be developed under 356 ha of land adjacent to the Patimban Port. The overall objective of the study is to conduct strategic development planning and implementation of the backup area to support Patimban Port effectively and efficiently. The study on the Back Up Area has been conducted to give recommendations on Back Up Area zoning, development phases, and schemes (funding and institutional arrangement), by considering the logistics services required by key industries’ supply chain, such as automotive, electronics, FMCG, and textile. The study also includes the synergy with Patimban Freight Railway and Hinterland (Rebana Area, specifically Patimban New City as part of Rebana Area) to ensure good connectivity and cargo volume captive from and to the port.
